Skip to product information
1 of 1

LoodgieterijAmsterdam.nl

Complete renovation of water and drainage pipes in the bathroom

Complete renovation of water and drainage pipes in the bathroom

Schedule your inspection or quote now – we'll respond quickly with a clear proposal.

Complete renovation of water and drainage pipes in your bathroom

Complete replacement or modification of water and drainage pipes during a bathroom renovation. Ideal for modernizing, relocating plumbing fixtures, or completely redesigning a bathroom. We work quickly, efficiently, and in accordance with applicable Dutch standards.

Description

  • Dismantling of old pipes and drains
  • Installation of new water pipes (cold/hot) and drains
  • Use of PEX, Alu-PEX, PVC or PP systems
  • Connections for shower, bath, sink, toilet and washing machine
  • Pressure and water tightness test
  • Coordination with tiler, electrician or contractor if necessary

Cost indication

Starting at €1,595.95 incl. VAT – including standard installation materials (pipes, fittings, valves, fasteners, and seals). The exact price will be determined after on-site inspection and consultation.

The indicative price includes standard installation materials (pipes, couplings, valves), but excludes sanitary ware, steel frames or design components (such as Easy Drain or Geberit).

Execution and planning

Average duration: 2–5 business days , depending on the size and number of water points. We coordinate the work with your renovation team to ensure smooth progress.

Why choose us

  • More than 20 years of experience with bathroom installations in Amsterdam
  • Full compliance with safety and installation standards
  • Transparent communication and clear agreements
  • Advice on material selection and technical solutions

Frequently Asked Questions (FAQ)


Can I get a quote in advance?
Yes. Send us photos or a floor plan of your current bathroom, and we'll schedule an inspection to determine the exact cost.


Do you work with my renovation team?
Yes, we can work with tilers, electricians, or contractors to ensure the project runs smoothly.


Are the materials included in the price?
Basic installation materials are included, but sanitary ware and special parts (such as mounting frames or Easy Drain) are not.


How long does the complete installation take?
Usually 2–5 working days depending on the number of connection points and the complexity of the project.


📩 Schedule your appointment now – we'll respond quickly with a clear proposal.


Professional installation, clear communication and reliable execution – that's LoodgieterijAmsterdam.nl.

View full details

Schedule your inspection or quote now
– we respond quickly with a clear proposal.